Every job below is one we do ourselves across Baldwin.
A full tear-off down to the decking, so we can see what's actually under your old shingles before we cover it back up. We replace any rotted plywood, run new underlayment and ice and water shield at the eaves, then lay architectural or three-tab shingles rated for coastal wind. Most jobs run two to three days from tear-off to cleanup, weather depending.
Leaks rarely start where the water shows up on your ceiling, so we trace it back to the actual entry point, usually a cracked pipe boot, lifted shingle, or flashing pulled away from a chimney. We fix the source, not just the stain, and patch the decking underneath if it's gone soft.
Three-tab and architectural shingles installed with the nailing pattern the manufacturer actually requires, not four nails when the shingle calls for six. We match the starter strip and ridge cap to the field shingle so the warranty stays intact.
EPDM rubber and TPO membranes on additions, garages, and porch roofs, seamed and sealed at every penetration. A flat roof pooling water instead of draining to the scupper is the first sign it needs attention, not something to wait on.
Step flashing around chimneys, valleys, and where a roof meets a dormer wall, re-bent and re-set rather than caulked over. Caulk is a stopgap, not a fix, and it fails faster than the metal underneath it ever would.
Ice damming backs water up under your shingles when heat leaks into the attic and melts snow unevenly on the roof. We add ice and water shield at the eaves and look at attic ventilation and insulation, because a new roof without fixing the airflow just gets the same ice dam next winter.
Hail knocks the granules off a shingle and leaves it brittle, and high wind lifts the tab line so water can track sideways under the seal strip. We document the damage with photos for your insurance claim and tarp the roof the same day if it's actively leaking.
One-piece aluminum gutters formed to your roof's exact run and hung with a slope that actually drains to the downspout instead of pooling at the center. We set them below the drip edge so water doesn't get behind the fascia.
New skylight openings framed and flashed correctly the first time, and leaking flashing on an existing skylight redone before it rots the header. A skylight that's leaking almost never needs a new skylight, it needs new flashing.
A yearly check of flashing, pipe boots, and granule loss catches small problems while they're still a repair instead of a replacement. We'll tell you honestly if your roof has a few years left or if you're better off planning for a new one.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
These are the towns where we're on roofs most weeks.
Questions that come up once a roofing project is actually underway.
Describe the problem and we will tell you what it probably is. No obligation.